Various polyethylene pipes and polyethylene screws and flanges with a wall thickness of 0.25 MPa and 10 MPa with a diameter of 20 mm and 630 mm for drinking water at Shurtansky Gas Chemical Complex LLC, 4 mm aluminum. Composite panels (AKP), canisters with a capacity of 10 liters.
For the production of polyethylene pipes at the German enterprise ERMAFA, BATTENFELD and SJ90 / 33 of the PRC. High-tech equipment SJ 120/33 is installed for the production of high-quality international standards (ISO, GOST).
Products manufactured by Shurtansky Gas Chemical Complex LLC are widely used in all sectors of the national economy and agriculture.
The polyethylene pipes produced by our company are superior in all respects, given the reluctance to buy expensive steel pipes abroad. Examples include low cost, lightweight, durable, unobtrusive contact with organic and minerals, low installation time and cost.
Our products are in great demand not only in the domestic market, but also abroad.
Our products have passed the necessary tests and have the following certificates:
- certificate of hygiene;
- certificate of conformity;
- certificate of quality.
“Shurtan Gas Chemical Complex” LLC produces the following products:
- polyethylene pipes with diameter from 20 mm up to 630 mm, with different thickness, resistant to pressure from 0.25 MPa up to 1.0 MPa and fittings;
- drip irrigation system (SKO);
- aluminum composite panels of different colors (ACP);
- polyethylene jerry cans of 10 liters;
Selling of finished products of “Shurtan Gas Chemical Complex” LLC (polyethylene pipes and fittings, drip irrigation systems, aluminum composite panels, polyethylene jerry cans) is carried out directly by conclusion of a contract.
Contracts are concluded on the basis of Law of the Republic of Uzbekistan about contractual legal base of Economic Entities.
To conclude the contract, a price list of finished products is provided on customer demand.
On the basis of provided price list, customer must send a letter of inquiry to conclude a contract for purchasing of necessary products, where all essential elements must be indicated.
On customer demand, on the basis of order of management of “Shurtan Gas Chemical Complex” LLC, contract is concluded in 2 (two) copies and is signed with the consent of both parties.
After signing of contract, seller provides customer with an invoice in writing form about readiness for production and loading of products specified in contract.
After making 100% prepayment for the products specified in the contract, the requested products shall be produced and loaded within 25 bank working days.
Based on provided invoice, customer makes 100% prepayment and on the basis of contract, customer must send his forwarder to receive the finished goods.
To receive the finished goods customer must have the following documents:
Based on the documents provided by customer, invoice for finished products is issued and signed in the accounting department and issued to customer to receive the goods.
Delivery of goods is carried out by customer based on EXW terms of delivery.
Loading of goods is carried out in “Karshitermoplast” shop.