History

  • 2019

    The project “Production of polyethylene foam and stretch film” is being implemented

    The project “Production of polyethylene foam and stretch film” is being implemented in the Khazorasp complex.

  • 2018

    The project “Production of pipes and their connections for sewerage system” was implemented

    The project “Production of pipes and their connections for sewerage system” was implemented on the basis of the polypropylene pipes joint enterprise (Navoi FEZ).

  • 2017

    A new production of competitive and import-substituting products was started on the basis of the project “Production of polypropylene pipes based on Shishabazalt fiber”

    A new production of competitive and import-substituting products was started on the basis of the project “Production of polypropylene pipes based on Shishabazalt fiber” on the basis of the Polypropylene Pipe joint enterprise (Navoi FEZ).

  • Enterprises of LLC “Nukus Polimer”

    In Yangiarik district (Khorezm region), enterprises of LLC “Nukus Polimer” were established in Yangiarik district (Khorezm region) and Nukus district (the autonomous republic of Karakalpakstan), whereby production of polymer boxes, containers and pipes was started.

  • Created a project on the organization of cotton yarn

    Created a project on the organization of cotton yarn on the basis of LLC "Kurbontex"

  • Construction of the livestock breeding complex.

    Construction of the livestock breeding complex.

  • The project “Production of plastics” was implemented

    The project “Production of plastics” was implemented in Karsithermoplast shop at LLC Shurtan GCC.

  • 2015

    Implementation of the project "Polymer coatings"

    The project “Production of polymer dye” was implemented in Karshithermoplast shop at LLC Shurtan GCC.

  • The complex is recreated.

    The company was reorganized into a limited liability company instead of a single joint enterprise.

  • Open kindergarten "Erkatoy-4".

    A kindergarten "Erkatoy-4" opened in Guzar.

  • 2012

    Opened a poultry farm.

    A branch of the poultry farm was opened at SGCC.

  • 2011

    Opened shop for the production of pasta and biscuits

    A workshop for the production of pasta and biscuits has been opened in Dekhkanabad district.

  • Created a shop for the production of energy-saving lamps

    A department for the production of energy-saving lamps was established in Dekhkanabad district.

  • 2010

    "Polypropylene pipes" branch is founded.

    The branch “Polypropylene pipes” was established in Navoi free industrial economic zone.

  • "Polyethylene pipes" branch is founded

    A branch “Polyethylene pipes” has been established in Navoi free industrial economic zone.

  • Expansion of the polyethylene pipe extrusion lineIn

    Expansion of the polyethylene pipe extrusion lineIn May, the range of polyethylene pipes was expanded in connection with the start of an extrusion line of polyethylene pipes with a diameter from 315 mm to 630 mm.

  • Start line for the production of aluminum composite panels

    Start line for the production of aluminum composite panels. In April, a production line for the production of aluminum composite panels was commissioned.

  • 2009

    The kindergarten "Erkatoy-3" was opened

    The kindergarten "Erkatoy-3" was opened. On February 3, a kindergarten Erkatoy-3 opened in Karshi.

  • Line started

    Line started. In July, a line for the production of components of the drip irrigation system was started, for facilities in the regions due to a shortage of irrigation water.

  • 2008

    The OHSAS 18001 Occupational Health and Safety system standard was introduced

    The OHSAS 18001 Occupational Health and Safety system standard was introduced. An occupational safety and health system has been introduced that complies with international standards OHSAS 18001, as well as an occupational safety and health management system.

  • 2007

    Started production of polyethylene pipe joints

    Production of polyethylene fittingsIn December, Karshithermoplast shop started production of polyethylene pipe joints.

  • The five-year anniversary of the complex was celebrated.

    The five-year anniversary of the complex was celebrated.In January, the fifth anniversary of the opening of SGCC was celebrated.

  • 2006

    Open kindergarten "Erkatoy"September 15, in Nuristan settlement opened a kindergarten "Erkatoy".

  • New school opened in Nuristan settlementIn September, a school with a capacity of 844 pupils was opened in Nuristan settlement.

  • "Karshithermoplast" shop transferred to the balance of the complexOn July 10, according to presidential decree of the Republic of Uzbekistan No. PP-406, Karshithermoplast shop (Uzbekistan, Karshi) was transferred to the balance of the complex and the production of polyethylene pipes with a diameter from 25 mm to 250 mm was started for the production of chemical-resistant polyethylene fluid and gas 0-40°C.

  • 2005

    Children's camp "Lochin" was put into operation.In Miraki village, Shakhrisabz district, Lochin children's health camp was commissioned.

  • The international TUV CERT certificate was obtained.Thanks to the German certification body TUV CERT, the company successfully passed the certification of quality management system ISO 9001: 2000 and passed the certification.

  • Ethylene production. October 13, ethylene production within the framework of the project.

  • 2004

    Awarded the prize “For the quality of products”In September, he was awarded the Product Quality Award in the USA.

  • Awarded a medal for product quality and an excellent indicator in businessIn September, the medal was awarded "For good quality products and a good indicator in business" in Geneva, Switzerland.

  • 2002

    The first ethylene polymer was obtainedJuly 30, the first ethylene polymer was obtained according to the specification.

  • First polyethylene productionOn August 15, the first Uzbek polyethylene brand UzClear® was developed.

  • 2001

    The opening Ceremony. On December 21, an official ceremony of presentation of the complex took place with the participation of President of the Republic of Uzbekistan I. A. Karimov and other high-ranking guests, where the symbolic key of the complex was presented and work began.

  • 1998

    The decision to create a green oasisOn July 26, the Cabinet of Ministers of the Republic of Uzbekistan issued Decree 266 “On the Establishment of a Green Oasis around Shurtan Gas Chemical Complex”.

  • The decision to create Management office of SGCCOn June 13, the Decision of the Cabinet of Ministers of the Republic of Uzbekistan No. 239 was adopted “On the establishment of framework of Shurtan Gas Chemical Complex in the central office of Uzbekneftegaz Corporation”.

  • The contract is signed. In February, Uzbekneftegaz NHC signed a construction contract for “ready for use” technological part of Shurtan Gas Chemical Complex with ABB Lummus Global Consortium (USA), ABB Solari (Italy), Mitsui & Co.Ltd, Toyo Engineering, Nisho Iwai Corp (Japan).

  • 1996

    The decree for construction of the complex. It was decided to build the complex in accordance with a Decree of the Cabinet of Ministers of the Republic of Uzbekistan dated November 11, 1996 No. 395 “On the construction of Shurtan gas-chemical complex for the production of polyethylene”.